SolarHost Case Study
As part of the SolarHost program, PowerFin installed two 130 kWdc (100 kWac) PV systems at the San Antonio River Authority (SARA). The systems were commissioned in March 2017 and generate approximately $12,000 of annual cost savings to the River Authority, a municipal entity separate from the electric utility. SARA paid nothing for the systems and all maintenance is handled by PowerFin.
Project Specifications